Core material |
E0/E1 grade plywood or MDF.
|
Solid wood (Ash/oak/beech/teak/rubber wood,etc.)
|
|
Surface finish
|
Veneer/High press laminate(HPL)/Melamine
|
Laquer finish
|
High glossy finish(close pore)/Matt finish(open/close pore)
|
Hardware
|
DTC/Hafele/Blum,etc.
|
Upholstery |
High quality Chinese fabric or pu leather,etc.
|
High density foam, can be with FR-CA117/NFPA 260/BS5852.
|
|
(As per client request)
|













Q2: When can you finish the Quotation?
A: It will take 1-3 working days
Q3: Can you produce any quality according to the client’s requirement?
A:We are custom-made hotel furniture manufacturer, in our factory we have each kind of machine, we can do great quality and any
style furniture according to client’s requirement. Before produce the mock up,we will prepare the veneer,fabric and steel
sample for client to confirm.
Q4: What is your MOQ ?
Hotel bedroom furniture MOQ is 30 sets
“A:For hotel bedroom furniture’s MOQ is 30 sets
For Single hotel furniture’s MOQ is 1*40HQ’ container’
Q5: What is your delivery time ?”
A:For mock up, if only 1-5 pcs, 10days we can finish after confirmed payment and shop drawing.if have 5 pcs more,15-20 days can finish after confirmed payment and shop drawing&material For mass production, 50-60 days can finish after confirmed deposit and shop drawing&material.”
Q6:What is your payment term ?
A:You can pay it by TT or LC, for mock up is 100% payment before produce. for mass production is 30% deposit before produce and 70% balance before loading.
Q7: What about the warranty of your factory?
A:We promise all customers with three-year warranty,before packing we have a professional QC term to check each piece to make sure all the furniture keep a top quality to show client.
– Billy
These beds are seriously plush! Like, sleeping on a cloud plush. King size is massive, perfect for sprawling. Double bed is also great, super comfy. Totally recommend for a luxurious upgrade!